Annexure-XVII

(Referred to in para 6.3.5.4)

(Rs. in lakh)

Sl. No

Name of Project

Plant

Year of Certification

Incremental CAB

Reasons recorded for non-utilisation

1

Gas dynamic study of sintering machine and suction track of M/c. nos. 1, 2 and 3.

BOSP

1994-95

138.90

Low utilisation of sintering machine

2

Improvement in internal soundness in concast slabs and coils of ferritic stainless steel.

ASP

1994-95

184.00

New R&D project taken superseeding the recommendation of the old project

3

Process intensification and modification of thermal regime in BF-5.

BOSP

1995-96

545.40

Recommendations not practised

4

Development of SAIL COR (Cold Rolled) through ASP-BSL route.

BOSP

1994-95

200.10

Recommendations not practised

5

Improvement in metallurgical properties of sinter and undergrate suction in M/c. No. 1 and 2.

DSP

1994-95

185.80

Recommendations not practised

6

Improvement in consistency of coal blend and upgradation of coke quality.

IISCO

1996-97

304.60

Deterioration in coal quality

7

Improvement in dimensional tolerance of 90 UTS rails confirming to 1 RST 1288.

BSP

1995-96

208.20

New project undertaken

8

Optimisation of blowing parameters of BF-2 with optimisation of burden distribution with MTA.

DSP

1995-96

775.10

Recommendations not in use

9

Achievement of 2 MT production of hot metal.

RSP

1996-97

259.30

Recommendations not in use

10

Experimental production of spade M-1 plates through new walking beam furnace.

RSP

1997-98

274.50

Low utilisation period

11

Process intensification in BF-5.

BOSP

1996-97

411.00

BF-5 is not in use

12

Improvement in performance of BF-6 compensator to facilitate increased blast temperature.

BSP

1997-98

242.50

Process not stabilised

13

Aerodynamics study of Sinter Machine No.1 and 2.

BOSP

1997-98

293.00

One time benefit obtained

14

Improvement in Sinter Making Operation & Machine No.3 & Sinter Mix Balling Region.

BOSP

98-99

197.07

One time benefit obtained

15

On-line voucher management system for financial accounting.

BSP

97-98

108.00

One time benefit obtained

16

Improvement in performance of BF-6 compensator to facilitate increased blest

BSP

97-98

242.50

Process not stabilised

17

Enhancement maintenance practice through contaminant analysis in lubricants and hydraulic fluids.

BOSP

99-00

125.90

One time benefit obtained

18

Improvement in oven through put & tar quality.

DSP

99-00

158.72

No improvement in performance indices