Extension for filling up the post of Commissioner (JS level), CMPFO, Ranchi upto 29.08.2021 20/1/2018-EO(SM-I) 09-11-2021 Railway Wing,
IR Wing
Inspection Reports,
Audit Plan,
WHO,
INTOSAI,
PDF English (1.53 MB)
Scheme of Partial Funding of Foreign Study No.35/9/2004-EO(F) 17-05-2004 Railway Wing
Contract Audit,
CVC,
Inspection Reports,
Audit Plan,
PDF English (80.07 KB)
PDF Hindi (80.07 KB)

- For enhanced search results, please login using your employee credentials.

Back to Top